Deprecated: Optional parameter $hour declared before required parameter $year is implicitly treated as a required parameter in /home3/ashbarde/public_html/wp-content/plugins/ingeniofy/salat-times/uCal.php on line 144

Deprecated: Optional parameter $minute declared before required parameter $year is implicitly treated as a required parameter in /home3/ashbarde/public_html/wp-content/plugins/ingeniofy/salat-times/uCal.php on line 144

Deprecated: Optional parameter $second declared before required parameter $year is implicitly treated as a required parameter in /home3/ashbarde/public_html/wp-content/plugins/ingeniofy/salat-times/uCal.php on line 144
Well Services - ASHBARD ENERGY
24/7 Phone Services 234-908-142-0853
info@ashbardenergy.com 18, Chief Nwuke Street, Trans Amadi Industrial Layout, Port Harcourt, Nigeria

Well Services

E-line Services

Saturation logging (pnn/pnnplus)

Cased Hole Logging

production logging (PLT-> production logging tool, -Noise Tool)

Well Testing

(Well Testing, g, E-line/Slickline, Dewaxin, Well Stimulation installation and Support Services).

Dewaxing

Stream Tracer™ — an integrated solution for preventing wax deposition in oil wells.

Coiled Tubing

Be it applications including drilling operations, hydraulic fracturing...

Well Stimulation

Petroboost technology is the result of two decades....

North seeking gyro

Our Solid‑State North Seeking Gyro (SSNSG) tool is the most advanced...

Slickline

Ashbard Energy provides slickline services ranging from basic operations,...

Intelligent Pigging / Pipeline Support

Intelligent Pigging/ Pipeline Support

Wireless Production Monitoring System

• Retrofit gauge installation • Drill Stem Testing